Your cart is empty now.
Account
Part of the 1.5m pile concreted foundation package.‚
‚ Applicable with: Single post &Twin post systems ‚ Suitable for: Sites where breaking ground is possible and geotechnical results permit use. Performs well in softer ground conditions. ‚ Installtion: Piling rig ‚ Material: S350, S450 galvanised steel (ZM310, ZM430, ZM620, ZM800). Corrosion protection to be determined from site location and ground investigations ‚ Dimensions: Determined by geotechnical and wind load test results ‚ Designed in accordance with: BS EN 1991-1-4:2005 +A1:2010. BS EN 1090 &BS EN 1991 Parts 1, 3 &7 (Eurocodes)
‚