Three Phase Synergy Inverter
Main features:
-
Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
-
Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
-
Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
-
Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
-
Built-in arc fault protection and optional rapid shutdown (
depending on Synergy Manager used
)
-
Built-in PID mitigation for maximized system performance.
-
Monitored‚ and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
-
Integrated DC safety switch eliminates the need for external DC isolators.
-
DC Fuses (Single Pole) 25A, optional‚ required for more than 3 strings only‚
25Amp fuse is NOT compatible with the S1200 optimisers. 30Amp fuse (per phase) replacement is required for this inverter to work with the S1200 optimiser.
‚
Please note FULL parts consist of 1x Synergy Manager and 2x Synergy Units ( 3x for 90 and 100kW)
‚
Some documents are currently missing. These will be added as soon as available.‚