Your cart is empty now.
Account
BMS-Parallel Box
This BMS is ideal for use with the X1 and X3 Hybrid Inverters. It allows you to double the storage capacity with the Triple Power 5.8kWh batteries.
The BMS parallel box acts as a replacement for the Master battery. If retrofitting the parallel box to an existing system, the Master battery becomes redundant and cannot be installed with the parallel box.
How many batteries can I install with this product?
Features‚
L-368 H-310 D-140mm
PLEASE NOTE: A minimum of 2 batteries (single phase) and 4 batteries (three-phase) must be used with this product.